Internal Wall Insulation Removal: Process, Cost & Contractors

Removing internal wall insulation is more disruptive than other types but often necessary when causing severe damp or condensation. Understand the full process, realistic costs (£4,000-£15,000), and what to expect during removal.

Why Remove Internal Wall Insulation?

Common Reasons for Removal

  • Severe condensation and black mould growth
  • Cold bridging at junctions causing persistent damp
  • Interstitial condensation trapped behind boards
  • Loss of room space (100-150mm per wall)
  • Damage to original walls during installation
  • ECO4/GBIS installation causing severe problems
  • Need to restore original character (period properties)

When NOT to Remove

  • Minor condensation solvable with ventilation upgrade
  • IWI functioning well but different aesthetic preferred
  • Cost of removal exceeds property value increase
  • Problems can be remediated for less money

Get a professional survey (£350-£600) to confirm removal is necessary before committing to this expensive and disruptive process.

IWI Removal Process: Step-by-Step

1

Pre-Removal Survey & Planning

Specialist assesses the IWI system, wall condition beneath, and plans removal approach. Identifies any asbestos risks (older properties) or listed building consent requirements.

What's assessed:

  • • Type of IWI system (board-on-dab, stud wall, hybrid)
  • • Extent of removal (full rooms vs partial walls)
  • • Condition of original wall beneath
  • • Services to disconnect (electrics, radiators)
  • • Access and waste disposal logistics

Timeline: 1-2 days

Includes survey, quote preparation, and planning permissions if needed.

Cost: Usually included in removal quote

2

Room Clearance & Protection

All furniture, carpets, and belongings must be removed. Dust sheeting installed to protect floors and adjacent rooms. Services isolated (electrics, water if needed).

Your responsibilities:

  • • Remove all furniture and belongings
  • • Arrange alternative accommodation (if extensive)
  • • Provide access to water and power
  • • Secure pets and valuables

Contractor provides:

  • • Dust containment screens
  • • Floor protection
  • • Waste skip (8-20 cubic yards)
  • • Vacuum extraction equipment
3

Insulation Board/System Removal

The messy part. Insulation boards, plasterboard, and fixings are removed. Method depends on installation type - board-on-dab adhesive is particularly difficult.

Removal methods:

  • Stud walls: Dismantle framework, remove boards
  • Board-on-dab: Pry boards off, scrape adhesive
  • Mechanical fixings: Unscrew/cut fixings
  • Hybrid systems: Combination approach

Timeline: 2-5 days

Depends on room size and system type. Board-on-dab takes longest.

Noise level: Very high - neighbors should be warned

4

Wall Surface Preparation

Original wall is revealed - often damaged from installation. Adhesive residue scraped off, holes from fixings filled, surface prepared for new finish.

Common damage found:

  • • Plaster knocked off during IWI installation
  • • Holes drilled for mechanical fixings
  • • Damp damage from condensation
  • • Crumbling brick/stone (if directly plastered)

Timeline: 1-3 days

Depends on condition beneath. May need re-plastering or damp treatment.

Additional cost: £15-30/m² for re-plastering

5

Replastering & Making Good

Walls are replastered with breathable lime or gypsum plaster. Services reinstalled (sockets, radiators). Skirting boards and architraves refitted or replaced.

What's included:

  • • Full re-skim or two-coat plaster
  • • Electrical sockets/switches reinstalled
  • • Radiators refitted and tested
  • • Skirting boards replaced/refitted
  • • Mist coat applied (if in quote)

Timeline: 3-5 days

Includes plastering, drying time, and second coat if needed.

Drying: 7-14 days before decorating

6

Decoration & Final Finishing

Usually not included in removal quotes. You'll need to arrange decoration yourself or get separate quotes. Allows you to restore original character or modernize.

Your costs:

  • • Painting/wallpapering: £10-20/m²
  • • New carpets/flooring: £20-80/m²
  • • Replacement furniture if damaged
  • • New curtains (larger windows revealed)

Timeline: 1-2 weeks

After plaster fully dried. Can take longer if ordering materials.

Budget: £1,000-£5,000 for full room redecoration

IWI Removal Cost Breakdown

Property Type Removal Only Removal + Replaster Full Package
1-Bed Flat£2,000 - £4,000£3,500 - £6,000£5,000 - £8,000
2-Bed House£4,000 - £7,000£6,500 - £10,000£9,000 - £13,000
3-Bed House£6,000 - £10,000£9,000 - £14,000£12,000 - £18,000
4-Bed House£8,000 - £12,000£12,000 - £17,000£15,000 - £22,000

Removal Only includes:

  • • IWI board/system removal
  • • Adhesive scraping
  • • Waste disposal
  • • Basic wall preparation

+ Replaster adds:

  • • Full wall replastering
  • • Services reinstallation
  • • Skirting refitting
  • • Mist coat primer

Full Package adds:

  • • Full decoration
  • • New flooring
  • • All finishing touches
  • • Move-in ready

Cost factors: Board-on-dab removal costs 30-40% more than stud walls due to labor intensity. Listed buildings may require specialist plasterers (+20-30%). Access issues (no parking, upper floors) add 10-15%.

Living Through IWI Removal

Expect Significant Disruption

IWI removal is the most disruptive insulation removal type. Unlike cavity wall or spray foam (external work), this happens inside your living space.

  • Dust: Extreme levels despite containment. Everything will need deep cleaning.
  • Noise: 8+ hours/day of loud power tools, breaking plaster, disposal.
  • Access: Contractors in your home 6-10 hours daily for 1-2 weeks.
  • No use of rooms: Affected rooms completely unusable during work.
  • Services off: Heating/electrics in rooms isolated for safety.

Consider Alternative Accommodation If:

  • • Removing IWI from entire house
  • • Young children or vulnerable occupants
  • • Health conditions affected by dust
  • • Working from home (impossible during works)
  • • Pets that stress easily

Can Stay If:

  • • Only 1-2 rooms affected
  • • Work can be phased over weekends
  • • You can tolerate disruption
  • • Alternative rooms to use
  • • Strong containment measures agreed

Need IWI Removed?

Get detailed quotes from specialists experienced in internal wall insulation removal. Compare costs for removal-only vs full restoration packages.